DIRECTORATE


DIRECTORATE Document 34-v3

Fermilab Engineering Manual

Document #:
DIRECTORATE-doc-34-v3
Document type:
Manual
Submitted by:
Maura Barone
Updated by:
Jemila Adetunji
Document Created:
08 Apr 2016, 12:03
Contents Revised:
20 May 2019, 12:09
Metadata Revised:
20 May 2019, 12:09
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
DIRECTORATE-doc-34-v2
20 May 2019, 11:11
DIRECTORATE-doc-34-v1
21 Apr 2016, 16:55
Abstract:
This document provides guidance for properly executing and documenting engineering projects at Fermilab. Anyone undertaking a design effort at Fermilab, regardless of his or her job classification, must follow this document. The specific requirements included in each step of the engineering process differ for projects carrying different degrees of risk, expense or involvement by other departments and institutions. However, for each project, engineers go through the same procedure, an Engineering Risk Analysis, to determine those requirements. This manual explains that procedure. It is important that the Engineering Risk Analysis be completed correctly for all projects at each step as it determines the appropriate level of formality as a project moves forward. Examples in the Appendix demonstrate how Fermilab engineers have conducted more formal processes for past projects.
Files in Document:
Other Files:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators